进口疏水阀

LIK进口疏水阀

参考价: 面议

具体成交价以合同协议为准
2017-07-17 03:52:47
287
产品属性
关闭
广州阿泰克阀门有限公司

广州阿泰克阀门有限公司

免费会员
收藏

组合推荐相似产品

产品简介

莱克生产的进口疏水阀,驱动方式可选用自动,连接方式可选用法兰、焊接、内螺纹,结构形式可选用硬密封,密封结构可选用,压力范围PN0MPa-100MPa,公称通径为15-500mm,材质可选用不锈钢(304、316、316L)、铸钢。由于阀门的使用范围非常的广泛,同一种阀门在不同的场合与工况有不同的搭配,如果您是非专业人士,欢迎您向本公司。

详细介绍

Performance / Advantages: 
■ Continues discharging saturation condensed water without accumulation, and so get the maximum thermal efficiency.
■ When steam pressure changes, the ball float can adjust the opening of valve seat without influence, and so it is stable.
■ With automatic and manual releaser, and so its exhaust performance is good without airlock and working is smooth without noise.

Application: 
By automation, speediness and continuing features, this valve is used for the steam heating equipment, condensation water recovery system and the place where needs removing condensation water at quick speed, and so stop steam leakage effectively and obtain optimum heating. 
Working Principle: 
By the action of buoyancy, the position of floating ball changes with the water level of condensation water and adjust the opening of valve seat automatically, continue to discharge condensation water, when the condensation water stops, the floating ball fall onto bottom by gravity, then close opening of drain valve. The opening of drain valve is below the water lever, and so the water is separated from steam automatically, and form water seal without steam leakage.
Performance Parameter/ Material List of Main Part: 
 

Mini Working Pressure

0.01Mpa

Maxi allowable temperature for cast steel

42 5 ℃

Mini degree of super cooling

≈ 0 ℃

Maxi allowable temperature for stainless steel

525 ℃

Leakage rate with loading

≈ 0

Working Medium

Saturated vapor, condensed water

Maxi allowable rate of back pressure

80%

Exhaust plant

Stainless steel / alloy

Valve body, cap

WCB / 304

Floating ball

Stainless steel

Valve seat

2Cr13 / 304

Filter

Stainless steel

Main Basis for Type Selection: 
■ Condensation water loading (discharge)kg/h (select the multiplying power 2~3 times).
■ Maximum working pressure Mpa
■ Operation pressure differential
■ Valve material and nominal pressure
■ Connection mode and dimension
Use and Maintenance: 
■ Confirm the valve material, pressure and check if the maximum is suitable for operation condition.
■ Before installation, clean the pipeline and clear away sundries.
■ The installation position shall be closed to heating equipment as much as possible.
■ Install the minimum point of pipe horizontally and the direction of flow should be the same to the label of valve.
■ Install steam trap for each heating equipment in case cause influence each other.
■ under the safe operation of system, open the valve in front of the steam trap, make it rise up to normal station slowly.
■ Do time-based maintenance for the normal working of steam trap. 
上一篇:热动力式疏水阀的优点有哪些 下一篇:蒸汽疏水阀安装注意事项
热线电话 在线询价
提示

请选择您要拨打的电话: