动态平衡电动二通阀/电动平衡调节阀/电动平衡阀

VPF动态平衡电动二通阀/电动平衡调节阀/电动平衡阀

参考价: 面议

具体成交价以合同协议为准
2016-05-16 14:47:57
292
产品属性
关闭
常州竹箦阀门有限公司

常州竹箦阀门有限公司

免费会员
收藏

组合推荐相似产品

产品简介

动态平衡电动二通阀/电动平衡调节阀/电动平衡阀关断力6.8Bar宽压差范围内盘管水流量精度自动恒定模数化流量工厂标定,无需现场平衡调试。电动执行器低噪运转,安装及拆卸十分方便电动执行器仅在动作时间15秒内耗电4VA,在全开或全关位置时机械锁定真正零耗电一体化动态平衡电动二通阀明显降低水系统流动噪声,*解决水力平衡问题,综合节能效果6%-35%。

详细介绍

 

 

动态平衡电动二通阀安装说明

. 安装前请仔细阅读产品说明书,核对产品型号。

. 水流方向必须按照阀体上指示得方向相同。

3. 在用于风盘或空气处理机组管路时,阀体须位于接水盘上方,以保证出现滴水时落 入接水盘中。

4. 阀体及执行器安装于垂直方向±60范围内,其上方应至少有30mm空间用于拆装。 与周围管道、设备、建筑物必须保持足够的维修操作空间,必须安装在维修人员通 过检修孔能触及到的地方。

5. 阀体安装完毕并与管路通过试压后才可安装执行器。阀前需装过滤器。

6. 所有接线需遵守国家和地方电气规范,执行器须避免受潮。

Instructions

. Read the instructions carefully, check the product model before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

安装方向/Installation direction

Instructions

. Read the instructions carefully, check the product model

before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

上一篇:ZDLP-16C-DN80直通式电动单座调节阀 下一篇:调节阀在20世纪取得了哪些进展与突破
热线电话 在线询价
提示

请选择您要拨打的电话: